In the spring of this year, after successful docking of small vessels in the dock NFD01, built according to our project, DDSG company decided to transfer the dock to the port of Enns to arrange there a shiprepair complex for their fleet, on the basis of:

  • dock
  • floating workshop
  • buffer vessel (in case of docking of long vessels)

general view

general view2

 

 

During May 2020 the prompt docking and repair of several barges was carried out.

docking barge

docking barge3

docking barge2

 

 

Also, with the assistance of our company, have begun works on installation of cranes to perform lifting operations during repair of self-propelled cargo ships.

cranes

 

Thus, on the basis of the dock NFD01, built according to our project, DDSG company successfully created its own ship repair base and significantly reduced the cost and time of repairing its fleet.