We've carried out a very interesting project of converting a dry cargo vessel (90 m long) into a river pusher (40 m long). The pusher is ready to use LNG as fuel (as the next step of modernization).
We've carried out a very interesting project of converting a dry cargo vessel (90 m long) into a river pusher (40 m long). The pusher is ready to use LNG as fuel (as the next step of modernization).